Attach a ground wire from one of the threaded studs (A) at the bottom of the housing, to the mounting plate (B). The ground resistance between all system parts shall be <. Power from factory ground must be installed by a qualified electrician. Each DISTRIBUTION BOX and controller must be grounded. 26 mm 2 (10 AWG) ground wire must be used, and in all other markets a 6 mm 2 must be used. Choose the right box based on environment (indoor/outdoor), load capacity, and durability. Ensure safe placement: install in. This Grounding Standard describes the technical requirements for grounding the SEC Distribution Network installations. SEC Distribution System extends from the MV (33 kV, 13. 8 kV) feeder outlets of HV / MV Substations down to SEC Customer interface including KWH-Meters and meter boxes. To provide. Today, we're diving deep into the world of distribution box grounding, breaking down the standards, and shining a light on those sneaky mistakes that even experienced electricians sometimes make.
[PDF Version]