A professional access control installation follows five stages: site survey, system design, hardware fitting, software configuration, and training/handover. Most small-to-medium installations (3 to 5 doors) are completed within one to two days with minimal disruption to daily. Ensure operation of lock is free of binding, grinding, or interference for door or frame features or other components. Close and open door, or operate several cycles, the opening to ensure that no binding or warping is affecting operation. If Exit Devices are used, confirm appropriate 'Push to. Ensure lower risk, faster start-up and optimum performance for your electrification system, from first operation through the entire life cycle of the equipment. Inspection of the equipment, parts and the software. 4 stages involved in installation process of electronic access control. This document is used as a guideline and selective reference work for the commissioning of Access Professional in an inde-pendent network and is designed to provide a brief overview of the most important points to be observed during initial commissioning. Please note that this document cannot cover. The line pipe (trunk channel) has open lines and buried lines. The open line requires horizontal and vertical, neat and beautiful, and the buried lines require short, smooth and less elbows; All cables must be installed in correct place, better to prepare extra length (1.