The proper installation of a distribution box involves placing it at the right height to ensure safety and convenience. 8 meters above the ground, which is convenient for operation and inspection. Ensure safe placement: install in dry, accessible areas with good ventilation and at appropriate height (typically ~1. three phase lines a, B and C (generally yellow, green and red), one zero line (light blue) and one ground line (yellow with green stripes). ① 220V load generally takes one phase line. According to the "Code for Acceptance of Construction Quality of Building Electrical Engineering" GB50303-2002, the vertical distance between the bottom surface of the fixed stainless steel enclosure ip67 and the ground should be greater than 1.